NY Methodist Hospital – special inspections and code compliance

Special Inspections

506 6th Street, Brooklyn: Inspected and provided LL 16/84 Report for 6 buildings including East Pavilion, Carrington Building, Infill Building, Kirkwood Pavilion, Miner Building, and Buckley Building.

501 6th Street, Brooklyn: Inspected and provided LL 16/84 Report and LL 26/04 Report of Compliance for Power Source Exit Signs.

508 6th St, Brooklyn: Special and Energy Code Compliance Inspection services for the Ambulatory Radiology Suite Project which included, Mechanical Systems, Heating Systems, Sprinkler Systems, Firestop, Draftstop & Fireblock Systems, Structural Steel – Welding, Structural Steel – Erection & Bolting, Structural Safety – Structural Stability, Final, HVAC and Service Water Heating Equipment, HVAC and Service Water Heating System Controls, Interior Lighting Power, Interior Lighting Controls, Duct Plenum and Piping Insulation and Sealing, Dampers Integral to Building Envelope, Duct Leakage Testing (includes performing test), Exit Signs, and Maintenance Information.

508 6th St, Brooklyn: Special and Energy Code Compliance Inspections for the 2nd Floor Cath Lab Project which included, Mechanical Systems, Sprinkler Systems, Firestop, Draftstop & Fireblock Systems, Structural Steel – Erection & Bolting, Final, Interior Lighting Power, Interior Lighting Controls, Duct Plenum and Piping Insulation and Sealing and Duct Leakage Testing.

508 6th St, Brooklyn:  Special Inspection Services for the Central Sterile Supply Project which included Mechanical Systems, Firestop, Draftstop & Fireblock Systems, Sprinkler Systems, Structural Steel – Welding, Structural Steel – Erection & Bolting, Cold Formed Steel, Heating Systems, Energy Code Compliance and Final Inspection.

508 6th St, Brooklyn: Special Inspection Services for Support of Excavation for the Fuel Oil Tank Replacement Project which included Excavation – Sheeting, Shoring, and Bracing; Structural Safety – Structural Stability; and Final inspection.

508 6th St, Brooklyn: and Progress Inspection Services for the Fuel Oil Tank Replacement Project which included preliminary inspections and special inspections for Fuel-Oil Storage & Fuel-Oil Piping Systems and Final inspections.

508 6th St, Brooklyn: Special Inspection Services for the Cytogenetics, Colabamin and Histology Labs Relocation Project which included Mechanical Systems, Heating Systems, Sprinkler Systems, Firestop, Draftstop & Fireblock Systems, Fire-Resistance Rated Construction, Seismic Isolation Systems, Final, HVAC and Service Water Heating Equipment, HVAC and Service Water Heating System Controls, Interior Lighting Power, Interior Lighting Controls, Duct Plenum and Piping Insulation and Sealing, Smoke Control Systems, Duct Leakage Testing (includes performing test), Exit Signs and Maintenance Information.

508 6th St, Brooklyn: Special Inspections for Oxygen Storage Tanks.

508 6th St, Brooklyn: Special and Energy Code Compliance Inspections for the Addition to Rehabilitation Medicine Project which included, Mechanical Systems, Heating Systems, Sprinkler Systems, Structural Steel – Welding, Structural Steel – Erection & Bolting, Structural Safety – Structural Stability, Final, HVAC and Service Water Heating Equipment, HVAC and Service Water Heating System Controls, Fenestration Areas, Fenestration Ratings for Air Leakage, Fenestration Thermal Values & Ratings, Insulation Placement and R Values, Air Sealing and Insulation – Visual, Interior Lighting Power, Interior Lighting Controls, Duct Plenum and Piping Insulation and Sealing and Exit Signs.

343 4th Ave, Brooklyn: Special and Energy Code Compliance Inspection Services for the Infusion Center Project which included mechanical systems, sprinkler systems, firestopping, and final inspection

515 6th Street, Brooklyn: Special and Energy Code Compliance Inspection Services for alterations including interior lighting power and lighting controls.

508 6th St, Brooklyn: Special Inspection Services for the Facade Repairs at East Pavilion Project which included steel – welding and structural steel – erection & bolting.