BPCA: Memorial and North Cove Marina Electrical Vault Resilience Project

Construction Management

The focus of the project is to provide construction management and inspection services for the construction and installation of mechanical and electrical infrastructure systems to support the Memorial and the south side of the Marina within two newly-designed above-ground structures which are located within Kowsky Plaza and south of the Liberty Street Ramp.

W. Allen Engineering is responsible for providing an Office Engineer responsible for requests for inquiry, tracking logs (for all Project costs, submittals, plan & specification changes, change orders, etc.), daily logs, meeting minutes, change order requests, track the disposition of all General Contractor submittals including general requirements schedule, procedures, materials, shop drawings, subcontractor and supplier qualification submittals in accordance with the Drawings and Specifications.